Skip to content

Can someone build it at your volume?

Draft your bill of materials

Describe your product, how many you expect to sell a year and where you want it made. The tool drafts a bill of materials with an estimated unit cost, lead time, minimum order and supply risk for every part.

Supply feasibility asks whether a reliable partner, with the experience, the process and the willingness to take the risk, can build your product at your volume. The answer depends on the parts, so the bill of materials comes first.

Every line can be edited, and the unit cost follows your edits. Export it as a PDF for your team, or as a CSV a supplier can quote from.

PartProcessUnit costLeadRiskENCLOSURE & AIRFLOWTop housingInjection moulded$1.80 – $2.603-4 wksMediumBottom housingInjection moulded$1.60 – $2.303-4 wksMediumIntake grilleInjection moulded$0.40 – $0.703-4 wksLowHEPA filter cartridgeOff the shelf$4.50 – $7.006-8 wksHighBLDC fan 12 VOff the shelf$3.20 – $4.808-10 wksMediumUNIT TOTAL$38 – $54
1 Describe your product and volume
2 Get a costed bill of materials
3 Edit and export
0/2000
Certifications it needs (optional)

Explore how the supply check works

Select a reference product to prefill the description, volume and region

Need an accurate budget?

Book a meeting with our technical sales team.

Book a discussion →